Concrete contractor software
Concrete is unforgiving about timing. The truck arrives at a fixed hour, the crew has to be there, the weather has to cooperate and the forms have to be ready — and if any one of those slips the whole day is wasted at considerable cost. WorksiteBase keeps the pour schedule, the crew assignment and the yardage on the same job, so the dependencies are visible before the truck is booked.
- Yardage calculated by hand and rounded the wrong way
- Pour dates colliding with crew availability
- Weather delays cascading through the schedule
- Hours per pour unknown until payroll
- Extra work at the pour never priced
Yardage without the guesswork
Dimensions and thickness in, cubic yards and material out — with your waste allowance applied consistently.
// Takeoff app
Takeoff · Interior repaint
Living room walls265 sq ft
Hallway walls132 sq ft
Ceiling156 sq ft
Total area553 sq ft
553 sq ft × $1.85/sq ft = $1,023.05
Two coats · low-VOC white
Estimate created
Pours and crews on one board
The pour date, the crew and the equipment sit together, so a booking conflict is visible before the truck is ordered.
// Job board · week of Jul 13
MonTueWedThuFri
North crewAlvarez · 3 techs
Reroof — 1420 Linden St. · 42 squares
South crewGarcia · 2 techs
Paver patio — Garcia residence
Deck build — Nguyen
East crewCramer · 2 techs
Roof replacement, Maple Way
1 job unassigned Thu/FriUtilization 84%
Hours against the pour
Crew time books to the job as it happens, which is the only way to know what a given type of pour actually costs you.
// Time tracking · Tue, Jul 21 · South crew
7:00a–4:30pPaver patio — Garcia residence8.5 h
7:00a–4:30pPaver patio (2nd tech)8.5 h
9:15a–1:15pPlate compactor (rental)4.0 h
Job total21.0 h
T&M ticket #T-88Garcia residence
520 sq ft pavers set · extra 6" excavation (T&M)
signed off on site
Common questions
- Can I schedule around weather?
- Jobs move with their crews and equipment in one step, and everyone affected is notified.
- Does it handle equipment rentals?
- Yes — rentals book to the job and land on the invoice.
- Can I bill in stages?
- Yes, including retainage where the contract requires it.